HRP Group

  • Owner:
    HRP Group
  • Architect:
    BKA Architects, Inc.
  • Scope:
    New Distribution Facility
  • Location:
    Saugus, MA

Multi-phased, ground-up construction of a distribution bc.game crypto casinofacility. The first phase of the project consisted of the demolition and removal of several existing buildings and utilities, the clearing of a 9.4 acre area, and the installation of crushed concrete to raise the grade in preparation for wicks and Controlled Modulus Columns (CMC’s) to minimize any settlement bc.game online live casinoof the new LEED Certified building. 

The second phase entailed the construction of the warehouse outfitted with state-of-the-art equipment and systems, as well as associated site work, including a new parking area and walkways around the building and the abutting shoreline. The site is surrounded by a rain garden and catch basins to minimize bc.game crypto casinoany water runoff to the shoreline and wetlands. 

    

LEED Level
  •   Certified